Klamath Falls, Oregon 2.45MW Building Former Mining Site
Klamath Falls, Oregon 2.45MW Building Former Mining Site downtown commercial bldg, prior use data center/BTC mining facility, designated as a datacenter by the City, County and state. 100G+ fiber available, upgradable to 6MW, 2.45 MW ready needs transformation,path to 6MW w Pacific Corp, including a SIS ready for signing est 8-10 months
1. Power The 2,500 kVA utility pad-mount transformer is energized, and our Pacific Power agreement provides for 2.45 MW of dedicated, contracted capacity. Existing downstream distribution includes three 150 kVA step-down transformers feeding two 400A/220V RPPs and one 200A/415V RPP. The “needs transformation” note refers to the additional switchgear, step-down transformers, distribution, and cooling needed to use the full service capacity. That fit-out would be designed around the buyer’s requirements and funded by the buyer. Usable IT capacity will depend on the final design and supporting loads.
For the approximately to 6 MW expansion, the PacifiCorp System Impact Study agreement is ready for signature but has not been executed. It requires a $10,000 study deposit, and PacifiCorp has quoted 8–10 months for the study. No additional capacity is reserved today; the proposed second feed and final available capacity remain subject to the study outcome. We expect the buyer to fund and manage that process around its load plan.
2. Building The building totals 4,000 square feet: a 2,000-square-foot data hall with approximately 15.5-foot ceilings and a separate 2,000-square-foot room intended for UPS and batteries. The 2,000-square-foot availability figure refers to the data hall; the entire building is included in the sale, along with the 48-by-24-foot rear yard intended for generators and dry coolers.
3. Existing infrastructure The site has not been stripped. The utility transformer, three step-down transformers, and three RPPs described above remain in place. No cooling plant, generators, or UPS systems are currently installed. Preliminary air-cooled and direct-to-chip designs and project plans are in the data room. The preliminary backup-power concept uses natural-gas generators.
4. Fiber Hunter Communications is lit to the building today at 1 Gbps, with connectivity to Hunter’s 100G ring. Higher service speeds would need to be confirmed with Hunter for your requirements. We also have information indicating a diverse Spectrum route and additional fiber options, which I’ll include in the data room. Service capacity, route diversity, and provisioning requirements should be confirmed directly with the providers. CenturyLink is also in the area.
5. Price and timing The asking price is firm at $999,000 and reflects the property’s energized infrastructure and dedicated, contracted 2.45 MW of power capacity. There is no mortgage on the property, so we can move promptly through diligence and escrow, with occupancy at closing.
Listing Details
- Category
- Infrastructure
- Listing type
- Mining Farm
- Location
- Klamath Falls, Oregon
- Available for
- Purchase
- Purchase price
- USD 999,999
- Asking price or lease rate
- 999,999
- Site type
- Existing data center
- Power capacity (MW)
- 2.45
- Future power capacity (MW)
- 6
- Power capacity range
- 1–5 MW
- Power cost (USD/kWh)
- 0.07
- Data center approval
- Approved for data center ai
- Utility power available
- Yes
- Natural gas available
- No
- Land size (acres)
- 0
- Facility size (sq ft)
- 2000
- Build-to-suit available
- Yes

Request Listing Details
Free for buyers
Your price is the same as going direct.
Comparable prices by email
Review the options before deciding on a call.
Trusted service since 2004
5,000+ clients helped.