Compare euro quotes with US rack prices
Dublin quotes come in euros, and Irish power is the most expensive in the EU, so a space rate means little until electricity is added at Irish prices.
Dublin colocation is about an English-speaking base in the EU, INEX, and a grid that has stopped taking new data centers.
Send us your specs and we’ll email matched Dublin options with this month’s prices and terms, plus London or Amsterdam when they fit better.
Free for you: providers pay us. Questions first? Call (888) 400-5732.


“Nobody publishes a Dublin price index, so the only real numbers are quotes. New grid connections are on hold, so space that’s already powered is what you can get.”
— Bob Spiegel, Founder, QuoteColo
Clients helped since 2004
Providers, including Dublin-area operators
For buyers: providers pay us
Prices and terms in writing, no sales calls
No major market report publishes a Dublin colocation rate, so prices come from operator quotes. The chart shows the four European markets CBRE does price, for context. Dublin vacancy was 7.2% in Q2 2026 (JLL), and new grid connections for data centers in the Dublin area have been effectively on hold since 2022.
Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.
These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.
Match the facility to the exact hardware and usable power you need. GPU capacity in Ireland is already listed on our desk, next to the UK and the rest of Europe.
| Deployment | Usable power | What we check | Price USD / month |
|---|---|---|---|
| High-density rack | 15–20 kW per rack, enough for one B300-class server | Cooling and A/B power at your density | On request: call to confirm |
| Liquid-cooled or 20 kW+ per server | Your total kW and kW per rack | Installed liquid cooling, not “liquid-ready” | Case by case, higher setup fees |
| GPU capacity listed in Ireland | 5 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175 per kW plus electricity, space and power |
| GPU capacity listed in United Kingdom | 3 MW to 6 MW blocks, from Q4 2026 | Install date, cooling, term and credit terms | $175–$250 per kW (some plus electricity), space and power |
| GPU capacity listed in Netherlands | 3 MW blocks, from Q1 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
| GPU capacity listed in Spain | 10 MW blocks, from Q3 2027 | Install date, cooling, term and credit terms | $146 per kW plus electricity, space and power |
Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.
Ireland, United Kingdom, Netherlands and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.
Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.
One requirements email in, a tighter shortlist out, and a straight answer on whether Dublin, London or Amsterdam is the better fit.
Dublin quotes come in euros, and Irish power is the most expensive in the EU, so a space rate means little until electricity is added at Irish prices.
Most of Dublin’s capacity is hyperscale; colocation is about 11% of what is installed in Ireland. The space a few racks need is spread across fewer operators, and smaller ones often have it.
They tell you which Dublin facilities exist. They can’t tell you who has power at your size this month, or what it costs.
Send your requirements once.
We match them against providers in our network of 500+, including operators that don’t publish prices.
You get the Dublin options that fit, with current prices, and call the ones you pick.
You never pay us. Providers cover it.
You send the specs. We find the options. You decide.
Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.
Estimates are fine. No perfect RFP needed.
We filter our network of 500+ providers down to a few that fit, then email you their names and estimated all-in pricing for your requirements.
Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.
Line up how each Dublin quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.
| Cost component | How Dublin providers usually bill it | Benchmark |
|---|---|---|
| Space and committed power | Larger deals: per kW of committed IT load. Retail racks: per cabinet with a set kW | Quoted per deal; no public Dublin benchmark |
| Electricity | Included up to the rack’s kW, or metered on top per kWh; ask which model each quote uses | About €0.27 per kWh before VAT for 500–2,000 MWh a year (Eurostat, H1 2026) |
| Cross-connects and INEX | Per connection a month plus a one-time fee; INEX ports are priced separately | On request |
| Remote hands | Hourly, often with a monthly bundle of hours | On request |
| VAT | Lettings of property are VAT-exempt unless the landlord opts to tax, and colocation without exclusive use of space is a service, not a letting (CJEU C-215/19). Check your contract with a tax adviser | 23% standard rate |
| Currency and term | Quoted in euros; some providers bill US dollars | Ask for both currencies |
You want an English-speaking base in the EU, your EU headquarters or privacy regulator is in Ireland, or your users are in Ireland and the UK.
If you need new power or a large block soon, price London and Amsterdam too: London is about 13 ms away and the Netherlands 17 ms, and both have more capacity coming.
We compare Dublin with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.
Equinix DB1, an INEX access site, and Keppel DC Dublin 1. A good start when you need INEX and many networks.
Digital Realty DUB1 and DUB2, both INEX access sites, with AWS and Azure on-ramps at DUB2, and Viatel’s VDC2.
The largest group: Equinix DB2, Digital Realty DUB3, DUB4, DUB13 and DUB14, CyrusOne and EdgeConneX, which states 20+ kW per cabinet. Larger suites and wholesale space.
Equinix DB3 and DB4, Digital Realty DUB10 with Servecentric’s suites inside, Keppel DC Dublin 2, Viatel VDC1 and Pure DC, which runs its own on-site gas generation.
Digital Realty DUB11 and DUB12 in Clonshaugh Industrial Estate, a smaller group on the north side.
London is about 13 ms away, the Netherlands 17 ms, Paris 20 ms and Frankfurt 27 ms, and US East (Virginia) about 73 ms (Azure round-trip medians, July 2026). Worth a look when Dublin can’t deliver your power or date.
Ireland had about 1,543 MW of installed data center IT capacity in 2025, and more than 99% of it is in the Greater Dublin Area (KPMG for the Irish government). The sites sit in business parks on the western and northern edge of the city.
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix DB1 | Equinix | Citywest | 4027 Kingswood Road, Citywest Business Campus, D24 | Interconnection; INEX |
| Keppel DC Dublin 1 | Keppel DC REIT | Citywest | Citywest Business Campus | Colocation, refurbished 2017–2020 |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Digital Realty DUB1 | Digital Realty | Park West | Unit 35, Lavery Avenue, Parkwest, D12 | Carrier-neutral colocation; INEX |
| Digital Realty DUB2 | Digital Realty | Park West | Unit 24, Hume Avenue, Parkwest, D12 | Interconnection; AWS and Azure on-ramps; INEX |
| Viatel VDC2 | Viatel | Park West | Unit 5, Beckett Way, Park West Business Park, D12 | Colocation from an Irish provider |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix DB2 | Equinix | Clondalkin | Unit 7 Kilcarbery Business Park, New Nangor Road, D22 | Interconnection; INEX |
| Digital Realty DUB3 and DUB4 | Digital Realty | Grange Castle | Grange Castle Business Park, Nangor Road, D22 | Tier III colocation; AWS and Azure on-ramps at DUB4; INEX at DUB3 |
| CyrusOne DUB1 | CyrusOne | Grange Castle | Conchobar Murray Avenue, Grange Castle Business Park South | Large-footprint colocation; 14 MW live, 54 MW planned |
| EdgeConneX Dublin | EdgeConneX | Grange Castle | Grange Castle Business Park, Old Nangor Road | 18 MW and 7 MW; 20+ kW per cabinet |
| Digital Realty DUB13 and DUB14 | Digital Realty | Profile Park | Profile Park 1 and 2, Kilcarbery, D22 | Colocation; AWS and Azure on-ramps |
| Facility / service location | Operator | Location | Address | Focus |
|---|---|---|---|---|
| Equinix DB3 | Equinix | Ballycoolin | Unit 2 Northwest Business Park, D15 | Interconnection; INEX |
| Equinix DB4 | Equinix | Ballycoolin | Unit 14, Northwest Business Park, D15 | Colocation |
| Digital Realty DUB10 | Digital Realty | Blanchardstown | Unit 9, Blanchardstown Corporate Park, D15 | Colocation, with Servecentric’s managed suites inside |
| Viatel VDC1 | Viatel | Blanchardstown | Unit 1, College Business & Technology Park, D15 | Colocation from an Irish provider |
| Keppel DC Dublin 2 | Keppel DC REIT | Ballycoolin | Ballycoolin Business and Technology Park | Carrier-neutral colocation |
| Pure DC DUB01 | Pure DC | Ballycoolin | 14-acre site in Ballycoolin | High density; on-site gas generation; 14 MW live, 54 MW planned |
A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); some operators give only the business park. “INEX” marks sites on INEX’s own list of Dublin access points. We also work with Dublin-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.
Different workloads. The same need for power, interconnection and clear commercial terms.
Dublin suits US companies that want an English-speaking base in the EU, firms whose EU privacy regulator is Ireland’s Data Protection Commission, and networks that peer at INEX. Match your workload to the power, cooling and data rules you need, then compare the full cost.

EU hosting for customers and contracts that ask where their data lives, in an English-speaking country.
Hosting close to your EU headquarters and your lead privacy regulator, the Data Protection Commission.
Peering at INEX, Ireland’s neutral exchange, where 112 member networks connect.
Dense racks in Ireland where usable kW, cooling and electricity terms are confirmed in writing.
European production workloads with redundancy, remote hands and room to grow.
A recovery site for London or another European site, about 13 ms from London.
Irish grid rules and EU law decide part of what you pay for, and what you can ask a provider to prove.
Since December 2025, a new data center of 10 MVA or more must bring its own dispatchable generation or storage to match its grid demand, and source 80% of its power from new Irish renewables within six years. EirGrid still calls the greater Dublin region “fully constrained”, and the policy is being challenged in the High Court.
Ireland’s Data Protection Commission is the lead EU privacy regulator for companies whose main EU establishment is in Ireland, including many large multinationals. Hosting in Dublin keeps data in the EU; transfers to certified US companies are allowed under the EU–US Data Privacy Framework.
Under NIS2, large data center providers count as “essential” entities, but Ireland had not passed its law putting NIS2 in place, the National Cyber Security Bill, by late November 2026. Ask providers which security measures they already apply.
Irish VAT is 23%. Whether a colocation contract counts as a VAT-exempt letting depends on its terms, so check with a tax adviser.
Sources: CRU large energy users connection policy (CRU/2025236); EirGrid on constrained areas (May 2026); Data Protection Commission annual report; NCSC on NIS2 entities; Revenue VAT rates. A summary, not legal or tax advice.
“Prices in Dublin move month to month, and power decides most of the bill. Tell me what you’re deploying and I’ll come back with what’s available now and what it costs, electricity included.”
Bob Spiegel, Founder, QuoteColo