Dublin colocation is about an English-speaking base in the EU, INEX, and a grid that has stopped taking new data centers.

Compare Data Centers & Prices in Dublin

Send us your specs and we’ll email matched Dublin options with this month’s prices and terms, plus London or Amsterdam when they fit better.

Free for you: providers pay us. Questions first? Call (888) 400-5732.

The river Liffey in Dublin’s Docklands with the Samuel Beckett Bridge and office buildings under grey cloud
Bob Spiegel

“Nobody publishes a Dublin price index, so the only real numbers are quotes. New grid connections are on hold, so space that’s already powered is what you can get.”

— Bob Spiegel, Founder, QuoteColo

5,000+

Clients helped since 2004

500+

Providers, including Dublin-area operators

Free

For buyers: providers pay us

Email

Prices and terms in writing, no sales calls

Dublin colocation prices and European benchmarks

No major market report publishes a Dublin colocation rate, so prices come from operator quotes. The chart shows the four European markets CBRE does price, for context. Dublin vacancy was 7.2% in Q2 2026 (JLL), and new grid connections for data centers in the Dublin area have been effectively on hold since 2022.

  • FrankfurtGermany; average $250
    $235–265 per kW
  • LondonUnited Kingdom; average $213
    $195–230 per kW
  • ParisFrance; average $190
    $175–205 per kW
  • AmsterdamNetherlands; average $180
    $165–195 per kW

Benchmarks: Coloprice Colocation Price Index, Q3 2026 (updated October 2026), from CBRE’s Global Data Center Trends 2026: Q1 2026, 250–500 kW requirements, USD per kW per month of committed IT load, excluding metered power. Licensed CC BY 4.0. Benchmarks, not quotes.

Prices change every month

These are public market benchmarks, not quotes: call us at (888) 400-5732 to confirm current prices and availability.

Call (888) 400-5732
  • Irish businesses paid the highest electricity prices in the EU in the first half of 2026: about €0.27 per kWh before VAT for users of 500–2,000 MWh a year (Eurostat). Ask each provider whether electricity is included or billed on top.
  • Data centers used 23% of Ireland’s metered electricity in 2025, up from 5% in 2015 (CSO), which is why the grid rules for new sites are strict.
  • We price racks, cages and suites on request, at this month’s rates. The GPU capacity listed in Ireland on our desk is in the next section.

GPU & high-density colocation in Dublin

Match the facility to the exact hardware and usable power you need. GPU capacity in Ireland is already listed on our desk, next to the UK and the rest of Europe.

Dublin GPU and high-density options
DeploymentUsable powerWhat we checkPrice
USD / month
High-density rack15–20 kW per rack, enough for one B300-class serverCooling and A/B power at your densityOn request: call to confirm
Liquid-cooled or 20 kW+ per serverYour total kW and kW per rackInstalled liquid cooling, not “liquid-ready”Case by case, higher setup fees
GPU capacity listed in Ireland5 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175 per kW plus electricity, space and power
GPU capacity listed in United Kingdom3 MW to 6 MW blocks, from Q4 2026Install date, cooling, term and credit terms$175–$250 per kW (some plus electricity), space and power
GPU capacity listed in Netherlands3 MW blocks, from Q1 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power
GPU capacity listed in Spain10 MW blocks, from Q3 2027Install date, cooling, term and credit terms$146 per kW plus electricity, space and power

Cooling follows your hardware, not the GPU label. We confirm the rack heat load, airflow or liquid requirements, A/B capacity and the infrastructure installed today; “liquid-ready” alone isn’t enough. Liquid cooling and servers over 20 kW are priced case by case, often with higher setup fees.

Ireland, United Kingdom, Netherlands and Spain: 5 listings on our desk, November 2026; listings, not confirmed offers. Per-kW rates cover space and power; “plus electricity” means power is billed on top. Bandwidth, cross-connects and remote hands are quoted separately.

kW Capacity Matcher

Check GPU capacity listed now

Enter your servers and the kW each one draws, e.g. 8 × B300 at 14 kW. The kW Capacity Matcher shows the GPU and high-density capacity we have on file, in the US and Europe, with the listed $/kW, the install window and a monthly estimate.

Free, no sign-up. Matched from 14 kW; liquid cooling and servers over 20 kW are priced case by case.

Why go through QuoteColo? It’s faster

One requirements email in, a tighter shortlist out, and a straight answer on whether Dublin, London or Amsterdam is the better fit.

THE DIY WAY

Compare euro quotes with US rack prices

Dublin quotes come in euros, and Irish power is the most expensive in the EU, so a space rate means little until electricity is added at Irish prices.

THE DIY WAY

Price only the biggest campuses

Most of Dublin’s capacity is hyperscale; colocation is about 11% of what is installed in Ireland. The space a few racks need is spread across fewer operators, and smaller ones often have it.

THE DIY WAY

Google, ChatGPT & ‘top 10’ lists

They tell you which Dublin facilities exist. They can’t tell you who has power at your size this month, or what it costs.

How it works

You send the specs. We find the options. You decide.

STEP 1

Send your requirements.

Tell us what you're deploying, where you want it, and when you need it. Send the specs you have; we'll help with the rest.

HardwareRacks & kWLocationStart date

Estimates are fine. No perfect RFP needed.

STEP 3

Take the next step. On your terms.

Like the options? Contact the providers directly. Need more detail? Call or email us. We're here to help, not push you.

  • Go directly to the providers you like
  • Ask us questions whenever you need

Our provider network

Equinix
CenterSquare
Hivelocity
Digital Realty
1547 Critical Systems Realty
Cologix
By clicking here, I state that I have read and understood the Terms and Conditions

Your rate per kW is only the starting point.

Line up how each Dublin quote bills space, power and electricity before you compare two providers, or a US-style all-in rack price.

How Dublin colocation is billed
Cost componentHow Dublin providers usually bill itBenchmark
Space and committed powerLarger deals: per kW of committed IT load. Retail racks: per cabinet with a set kWQuoted per deal; no public Dublin benchmark
ElectricityIncluded up to the rack’s kW, or metered on top per kWh; ask which model each quote usesAbout €0.27 per kWh before VAT for 500–2,000 MWh a year (Eurostat, H1 2026)
Cross-connects and INEXPer connection a month plus a one-time fee; INEX ports are priced separatelyOn request
Remote handsHourly, often with a monthly bundle of hoursOn request
VATLettings of property are VAT-exempt unless the landlord opts to tax, and colocation without exclusive use of space is a service, not a letting (CJEU C-215/19). Check your contract with a tax adviser23% standard rate
Currency and termQuoted in euros; some providers bill US dollarsAsk for both currencies
Your Dublin bill

Get the full monthly bill for your Dublin setup

The benchmarks above show where the market sits. Send your racks, kW, bandwidth and cross-connects, and we’ll email the all-in monthly cost from the Dublin providers that fit, electricity and extras included, at this month’s prices.

Free for you: providers pay us. Options by email within 48 hours.

Is Dublin right for your workload?

A strong fit

You want an English-speaking base in the EU, your EU headquarters or privacy regulator is in Ireland, or your users are in Ireland and the UK.

Compare another market

If you need new power or a large block soon, price London and Amsterdam too: London is about 13 ms away and the Netherlands 17 ms, and both have more capacity coming.

We’ll tell you which

We compare Dublin with a realistic Plan B and explain the trade-offs in price, latency, power availability and data rules before you choose a provider.

Where to land in Dublin and why

  1. Citywest (Dublin 24)

    Equinix DB1, an INEX access site, and Keppel DC Dublin 1. A good start when you need INEX and many networks.

  2. Park West (Dublin 12)

    Digital Realty DUB1 and DUB2, both INEX access sites, with AWS and Azure on-ramps at DUB2, and Viatel’s VDC2.

  3. Clondalkin, Grange Castle and Profile Park (Dublin 22)

    The largest group: Equinix DB2, Digital Realty DUB3, DUB4, DUB13 and DUB14, CyrusOne and EdgeConneX, which states 20+ kW per cabinet. Larger suites and wholesale space.

  4. Ballycoolin and Blanchardstown (Dublin 15)

    Equinix DB3 and DB4, Digital Realty DUB10 with Servecentric’s suites inside, Keppel DC Dublin 2, Viatel VDC1 and Pure DC, which runs its own on-site gas generation.

  5. Clonshaugh, near the airport

    Digital Realty DUB11 and DUB12 in Clonshaugh Industrial Estate, a smaller group on the north side.

  6. Your Plan B market

    London is about 13 ms away, the Netherlands 17 ms, Paris 20 ms and Frankfurt 27 ms, and US East (Virginia) about 73 ms (Azure round-trip medians, July 2026). Worth a look when Dublin can’t deliver your power or date.

Dublin data centers

Ireland had about 1,543 MW of installed data center IT capacity in 2025, and more than 99% of it is in the Greater Dublin Area (KPMG for the Irish government). The sites sit in business parks on the western and northern edge of the city.

Citywest (Dublin 24)

Citywest (Dublin 24) data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix DB1EquinixCitywest4027 Kingswood Road, Citywest Business Campus, D24Interconnection; INEX
Keppel DC Dublin 1Keppel DC REITCitywestCitywest Business CampusColocation, refurbished 2017–2020

Park West (Dublin 12)

Park West (Dublin 12) data center directory
Facility / service locationOperatorLocationAddressFocus
Digital Realty DUB1Digital RealtyPark WestUnit 35, Lavery Avenue, Parkwest, D12Carrier-neutral colocation; INEX
Digital Realty DUB2Digital RealtyPark WestUnit 24, Hume Avenue, Parkwest, D12Interconnection; AWS and Azure on-ramps; INEX
Viatel VDC2ViatelPark WestUnit 5, Beckett Way, Park West Business Park, D12Colocation from an Irish provider

Clondalkin, Grange Castle and Profile Park (Dublin 22)

Clondalkin, Grange Castle and Profile Park (Dublin 22) data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix DB2EquinixClondalkinUnit 7 Kilcarbery Business Park, New Nangor Road, D22Interconnection; INEX
Digital Realty DUB3 and DUB4Digital RealtyGrange CastleGrange Castle Business Park, Nangor Road, D22Tier III colocation; AWS and Azure on-ramps at DUB4; INEX at DUB3
CyrusOne DUB1CyrusOneGrange CastleConchobar Murray Avenue, Grange Castle Business Park SouthLarge-footprint colocation; 14 MW live, 54 MW planned
EdgeConneX DublinEdgeConneXGrange CastleGrange Castle Business Park, Old Nangor Road18 MW and 7 MW; 20+ kW per cabinet
Digital Realty DUB13 and DUB14Digital RealtyProfile ParkProfile Park 1 and 2, Kilcarbery, D22Colocation; AWS and Azure on-ramps

Ballycoolin and Blanchardstown (Dublin 15)

Ballycoolin and Blanchardstown (Dublin 15) data center directory
Facility / service locationOperatorLocationAddressFocus
Equinix DB3EquinixBallycoolinUnit 2 Northwest Business Park, D15Interconnection; INEX
Equinix DB4EquinixBallycoolinUnit 14, Northwest Business Park, D15Colocation
Digital Realty DUB10Digital RealtyBlanchardstownUnit 9, Blanchardstown Corporate Park, D15Colocation, with Servecentric’s managed suites inside
Viatel VDC1ViatelBlanchardstownUnit 1, College Business & Technology Park, D15Colocation from an Irish provider
Keppel DC Dublin 2Keppel DC REITBallycoolinBallycoolin Business and Technology ParkCarrier-neutral colocation
Pure DC DUB01Pure DCBallycoolin14-acre site in BallycoolinHigh density; on-site gas generation; 14 MW live, 54 MW planned

A representative list of facilities, not a live inventory of available space. Addresses from the operators’ own sites (November 2026); some operators give only the business park. “INEX” marks sites on INEX’s own list of Dublin access points. We also work with Dublin-area operators that don’t show up in search, and we confirm the service scope, capacity and terms for your requirement.

Who colocates in Dublin

Different workloads. The same need for power, interconnection and clear commercial terms.

Ireland’s colocation market

Dublin suits US companies that want an English-speaking base in the EU, firms whose EU privacy regulator is Ireland’s Data Protection Commission, and networks that peer at INEX. Match your workload to the power, cooling and data rules you need, then compare the full cost.

A grey data center campus with rooftop cooling and a fenced substation in a business park on the edge of Dublin

US SaaS with EU customers

EU hosting for customers and contracts that ask where their data lives, in an English-speaking country.

Companies with their EU base in Ireland

Hosting close to your EU headquarters and your lead privacy regulator, the Data Protection Commission.

Networks and content providers

Peering at INEX, Ireland’s neutral exchange, where 112 member networks connect.

AI / GPU teams

Dense racks in Ireland where usable kW, cooling and electricity terms are confirmed in writing.

Enterprise IT

European production workloads with redundancy, remote hands and room to grow.

Recovery / secondary sites

A recovery site for London or another European site, about 13 ms from London.

Rules that shape Dublin colocation

Irish grid rules and EU law decide part of what you pay for, and what you can ask a provider to prove.

Grid connection rules

Since December 2025, a new data center of 10 MVA or more must bring its own dispatchable generation or storage to match its grid demand, and source 80% of its power from new Irish renewables within six years. EirGrid still calls the greater Dublin region “fully constrained”, and the policy is being challenged in the High Court.

GDPR and the Data Protection Commission

Ireland’s Data Protection Commission is the lead EU privacy regulator for companies whose main EU establishment is in Ireland, including many large multinationals. Hosting in Dublin keeps data in the EU; transfers to certified US companies are allowed under the EU–US Data Privacy Framework.

NIS2

Under NIS2, large data center providers count as “essential” entities, but Ireland had not passed its law putting NIS2 in place, the National Cyber Security Bill, by late November 2026. Ask providers which security measures they already apply.

VAT

Irish VAT is 23%. Whether a colocation contract counts as a VAT-exempt letting depends on its terms, so check with a tax adviser.

Sources: CRU large energy users connection policy (CRU/2025236); EirGrid on constrained areas (May 2026); Data Protection Commission annual report; NCSC on NIS2 entities; Revenue VAT rates. A summary, not legal or tax advice.

“Prices in Dublin move month to month, and power decides most of the bill. Tell me what you’re deploying and I’ll come back with what’s available now and what it costs, electricity included.”

Bob Spiegel, Founder, QuoteColo

Bob Spiegel
By clicking here, I state that I have read and understood the Terms and Conditions

Dublin colocation FAQ

How much does colocation cost in Dublin?
No major market report publishes a Dublin rate, so pricing comes from operator quotes. For context, CBRE put 250–500 kW deals in London, Paris, Amsterdam and Frankfurt at $165–265 per kW a month in Q1 2026, excluding power, and Irish electricity is the most expensive in the EU. Prices change every month, so call us at (888) 400-5732 or send your specs to confirm current prices and availability.
Is Dublin cheaper than London or Amsterdam?
It depends on the power. Space rates are quoted deal by deal, but across all business users Irish electricity averaged about €0.24 per kWh before VAT in the first half of 2026, against about €0.18 in the Netherlands and €0.15 in France (Eurostat). For a power-heavy deployment the electricity line can decide it, so we price Dublin and your Plan B side by side with power included.
Can new data centers still connect to the grid in Dublin?
Effectively not for now. EirGrid stopped connecting new Dublin data centers in 2022, and in May 2026 it still described the greater Dublin region as fully constrained. Under the December 2025 rules, a new site of 10 MVA or more must also bring its own generation or storage. For buyers, Dublin capacity comes from space already built or already contracted.
What is INEX, and where can I connect?
INEX is Ireland’s neutral internet exchange: 112 member networks connect, and it peaked at about 1.56 Tbit/s in the past year. In Dublin you can connect directly in Equinix DB1, DB2 and DB3 and Digital Realty DUB1, DUB2 and DUB3. If you peer or need many networks, pick one of those; if you only buy transit, any well-connected site can work.
Why do US companies colocate in Dublin?
Ireland gives US companies an English-speaking base in the EU, about 73 ms from Virginia and 13 ms from London on Microsoft’s network. Many US multinationals have their EU headquarters there, which makes the Data Protection Commission their lead privacy regulator. The trade-off is power: Irish electricity is the most expensive in the EU, and new grid connections are hard to get.
Can I put a dense GPU rack in Dublin?
Yes, in the right hall. EdgeConneX states 20+ kW per cabinet in Dublin, and NVIDIA lists Digital Realty’s Dublin sites as ready for liquid cooling. No Dublin operator has announced a liquid-cooled hall with a published kW per rack, and dense deployments depend on space that is already powered, so confirm cooling type and per-rack power in writing.
Is the Irish grid policy final?
Not yet. Environmental groups challenged the regulator’s December 2025 connection policy for data centers, and the High Court hearing began on 17 November 2026; no judgment had been reported by late November. Existing sites keep their connections, but plans for new Dublin capacity depend on the outcome.
Is the service free?
Yes. QuoteColo is free for buyers. Providers share their existing standard sales commission with us, so there’s no added fee or markup on your provider quote. You contract directly with the provider you choose.
How fast do I get options?
Matched options arrive by email within 48 hours once your requirements are clear, and there are no calls until you’ve reviewed them. Prices and capacity in Dublin change every month, so every option comes with the current price and availability, confirmed with the provider.

Get 2–4 qualified options in 48 hours

Free for buyers

Your price is the same as going direct.

You will get all-in price estimates by email

From 500+ providers. No sales calls, no long forms.

Trusted service since 2004

5,000+ clients helped.

Your request will be sent securely to QuoteColo.